2-1SECTION 2INSTALLATIONWARNINGDo not obstruct the flow of combustionand ventilation air to and from youroven. There must be no obstructionsaround or
2-10SECTION 2INSTALLATIONFigure 2-10Dimensions and Data: PS360WB-U Quad Tandem
2-11SECTION 2INSTALLATIONIV.THERMOCOUPLEINSTALLATION1. Install the thermocouplesensing bulb into the correcthole in rear of bake chamber asshown in F
2-12SECTION 2INSTALLATION87654L2L19101112131415164. Connect the thermocoupleleads to the temperature con-troller as shown in Figure2-13.5. Repeat St
2-13SECTION 2INSTALLATIONV. ASSEMBLYIf the installation includes upper ovens mounted atop lowerovens, the ovens must be stacked before joining the tan
2-14SECTION 2INSTALLATIONJOINING THE OVEN BODIESFor TANDEM and DOUBLE TANDEM installations, performSteps 1-7 to join the ovens.For TRI TANDEM installa
2-15SECTION 2INSTALLATION3. Insert three of the supplied1/2 x 5 bolts through theholes in the frame of the rightoven, pointing outward asshown in Fig
2-16SECTION 2INSTALLATION5. Check the alignment ofthe track rails using astraightedge. The railsMUST BE LEVEL acrossthe gap between theovens. If nec
2-17SECTION 2INSTALLATION9. Test-fit the transitionsection of the conveyorframe, as shown in Figure2-21. The alignment pinson the bottom of the frame
2-18SECTION 2INSTALLATION10. Remove the transition section of the conveyor frame.Place the transition floor panel into place atop the supportbrackets.
2-19SECTION 2INSTALLATIONINSTALLING THE CONVEYOR FRAME AND BELT1. Insert the conveyor frame into the oven as follows:For TRI TANDEM ovens, slideone ce
2-2SECTION 2INSTALLATION2"51mmMinimum18"458mm18"458mm12"305mm3”76mmII. INSTALLATION, PREPARATION, ANDSUPPLYWhen preparing the oven
2-20SECTION 2INSTALLATION2. Slide the conveyor beltthrough the support rodsunderneath the frame, andthread it through the oven.Then, reach through the
2-21SECTION 2INSTALLATION5. For a TANDEM, DOUBLE TANDEM, or TRI TANDEMoven installation, skip ahead to the next section. For aQUAD TANDEM oven instal
2-22SECTION 2INSTALLATION6645223315GAS OVEN ROUGH-INUTILITY ROUGH-IN DIMENSIONS AND POSITIONINGGAS SUPPLY&ELECTRICAL SUPPLYPROVIDED BY CUSTOMERDO
2-23SECTION 2INSTALLATIONVI. ELECTRICAL CONNECTIONCheck the oven data plate before making any electric supplyconnections. Electric supply connections
2-24SECTION 2INSTALLATIONFigure 2-34Typical Oven Data Plate - Models PS360/PS360WB
2-25SECTION 2INSTALLATIONFigure 2-35Flexible Hose Connector InstallationApplianceConnection/Male NippleFlexible HoseCorrect PositionFull-Flow GasShuto
2-26SECTION 2INSTALLATIONVIII. PREPARATION FOR VARIOUS GASESBefore proceeding to set up the oven for a specific gas, themain gas supply valve and the
2-27SECTION 2INSTALLATIONOutlet Pressure TapLow FlameBypass Orifice3/4 UnionPilot LineLow FlameBypass Line1/2 NutsMain OrificeGovernor AdjustmentGa
2-28SECTION 2INSTALLATIONIX. CHANGING ORIFICESTO CHANGE MAIN ORIFICE (Refer to Figure 2-36)1. Turn off main gas supply valve.2. Open 3/4" union i
2-29SECTION 2INSTALLATION4. Replace cover screw on adjustment valve and turn off maingas supply valve.5. Record the reading obtained from the gas mete
2-3SECTION 2INSTALLATIONIII. VENTILATION SYSTEMIMPORTANTWhere international, national, or local codes requirethe installation of fire suppression equi
2-30SECTION 2INSTALLATIONSPECIAL NOTICES:The ovens should be operated only in an area that has good aircirculation.The oven must be installed under an
2-4SECTION 2INSTALLATIONPS360L/WB-L TandemPS360/WB Double TandemPS360U/WB-U Tri TandemItem Part # Description PS360U/WB-U Quad Tandem1 22361-0001 Flex
2-5SECTION 2INSTALLATION6”152mm10-1/2”267mm16-1/2"419mm11-1/2"292mm27-1/4"692mm27-1/4"692mm54-1/2"1384mm17-3/4"451mm31-1
2-6SECTION 2INSTALLATION34"864mm16-1/2"419mm11-1/2"292mm27-1/4"692mm27-1/4"692mm54-1/2"1384mm5-27/32"148mm10-1/8&qu
2-7SECTION 2INSTALLATIONFigure 2-7Dimensions and Data: PS360U Tri Tandem
2-8SECTION 2INSTALLATIONFigure 2-8Dimensions and Data: PS360WB-U Tri Tandem
2-9SECTION 2INSTALLATIONFigure 2-9Dimensions and Data: PS360U Quad Tandem
Commentaires sur ces manuels